Berridge Spanish Tile & S-Tile


The Berridge Spanish Tile System incorporates the Berridge Deep-Vee structural panel with stamp-formed steel barrel tiles. This unique two layer system eliminates the need for solid sheathing or furring strips. The special Deep-Vee Panel used in the Spanish Tile System is 9" wide. Individual barrel tiles are 8" wide with a 16" exposure.

DOWNLOAD CAD DETAILS

(19K - 1 DWG FILE - PRODUCT OVERVIEW)

Spanish Tile Specifications

To use these specs in your project document, just use your mouse to drag and select all specification copy, then copy to the clipboard (CTRL - C), then paste into an open document (CTRL -V).

MANUFACTURER

Berridge Manufacturing Company

1720 Maury Street

Houston, Texas 77026

Phone: (800) 231-8127 Outside TX

(713) 223-4971 In TX

Fax: (713) 236-9422

PDF DATA SHEET (4MB FILE)
PDF File of Installation Details

SPANISH TILE ROOF SYSTEM

The Berridge Spanish Tile System is composed of prefinished interlocking barrel tiles installed over the Deep-Vee structural panel system. Provides an authentic appearance and may be applied over solid substrate or open framing on roofs and mansards.

- Stronger, lighter than clay tile

- May be installed over open framing

- Hidden Fasteners

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Preformed, prefinished metal roofing and flashings.

B. Miscellaneous trim, flashing, closures, drip flashing,

and accessories.

C. Sealant

D. Fastening devices.

1.02 RELATED SECTIONS

A. Section 05120: Structural Steel Framing.

B. Section 05500: Miscellaneous metal fabrication.

C. Section 06100: Rough Carpentry.

D. Section 07631: Flashing and Sheet Metal Gutters.

E. Section 07900: Sealants.

1.03 REFERENCES

A. American Iron & Steel Institute (AISI) Specification for the Design of Coldformed Steel Structural Members.

B. ASTM A-653 & ASTM A924  Steel Sheet, Zinc-Coated (Galvanized)

C. Spec Data Sheet - Galvalume Sheet Metal by Bethlehem Corp.

D. SMACNA - Architectural Sheet Metal Manual.

1.04 ASSEMBLY DESCRIPTION

A. The roofing assembly includes preformed sheet metal panels, related accessories, valleys, hips, ridges, eaves, corners, rakes, miscellaneous flashing and attaching devices.

1.05 SUBMITTALS

A. Submit detailed drawings showing layout of panels, anchoring details, joint details, trim, flashing, and accessories. Show details of weatherproofing, terminations, and penetrations of metal work.

B. Submit a sample of each type of roof panel, complete with factory finish.

C. Submit calculations with registered engineer seal, verifying roof panel and attachment method resists wind pressures imposed on it pursuant to applicable building codes.

1.06 QUALITY ASSURANCE

A. Manufacturer: Company specializing in Architectural Sheet Metal Products with ten (10) years minimum experience.

B. No product substitutions shall be permitted without meeting specifications.

C. Substitutions shall be submitted 10 Days prior to Bid Date and acceptance put forth in an addendum.

D. No substitutions shall be made after the Bid Date.

1.07 DELIVERY, STORAGE AND HANDLING

A. Upon receipt of panels, tiles and other materials, installer shall examine the shipment for damage and completeness.

B. Panels and tiles should be stored in a clean, dry place. One end should be elevated to allow moisture to run off.

C. Panels and tiles with strippable film must not be stored in the open, exposed to the sun.

D. Stack all materials to prevent damage and to allow for adequate ventilation.

1.08 WARRANTY

A. Paint finish shall have a twenty year guarantee against cracking, peeling and fade (not to exceed 5 N.B.S. units).

B. Galvalume material shall have a twenty year guarantee against failure due to corrosion, rupture or perforation.

C. Applicator shall furnish guarantee covering watertightness of the roofing system for the period of two (2) years from the date of substantial completion.

PART 2 PRODUCT

2.01 ACCEPTABLE MANUFACTURERS

A. Berridge Manufacturing Company, Houston, Texas.

B. Substitutions shall fully comply with specified require-ments.

2.02 SHEET MATERIALS

A. Prefinished Metal shall be Hot-Dipped Galvanized - ASTM A446-85 Grade C G90 Coating A525-86 24 Gauge core steel or prefinished Galvalume - ASTM A792-86 AZ-55.

B. Unfinished Metal shall be Grade C Galvalume ASTM 792-86, AZ 55, "Satin Finish".

C. Finish shall be [full strength Kynar 500 Fluoropolymer coating] [Copper-Cote][Lead-Cote] [Champagne] coating, applied by the manufacturer on a continuous coil coating line, with a top side dry film thickness of 0.70 to 0.90 mil over 0.25 to 0.35 mil prime coat, to provide a total dry film thickness of 0.95 to 1.25 mil. Bottom side shall be coated with primer with a dry film thickness of 0.25 mil. Finish shall conform to all tests for adhesion, flexibility, and longevity as specified by the Kynar 500 finish supplier.

D. Strippable film shall be applied to the top side of the painted coil to protect the finish during fabrication, shipping and field handling. This strippable film must be removed before installation.

2.03 ACCESSORY MATERIALS

A. Fasteners: [Galvanized Steel] [Stainless Steel] [Cadmium Plated Steel] with washers where required.

B. Sealant: As specified in Section 07900 [ ] Type.

2.04 FABRICATION

A. All exposed adjacent flashing shall be of the same material and finish as the roof panels.

B. Hem all exposed edges of flashing on underside, 1/2 inch.

2.05 BERRIDGE SPANISH TILE

1. Deep Vee Panels to be used as a substrate support for the Spanish Tile shall be factory formed to 40' max. Seam spacing shall be 9" on center.

2. Prefinished interlocking barrel tiles shall be stamped with an 8" by 16" exposure to the weather.

3. Tiles shall be attached to the top of the Deep Vee Panel with one number 8 TEK screw.

4. Eave closures shall be used at the eave with each row of Spanish Tile.

5. Attachment of the Deep Vee Panel shall be through the flat area adjacent to the overlapping rib with cadmium plated screws spaced [5'-0" on center maximum for open span structural supports] [20" on center for solid sheathing]. Stitch the side laps of the Deep Vee Panel at the top of the crown with #8 TEK screws 20" on center.

6. Tiles shall be attached to the top of the crown on the Deep Vee panel with one #8 x 1/2" TEK screw.

PART 3 EXECUTION

3.01 INSPECTION

A. Substrate:

1. Examine plywood or metal deck to ensure proper attachment to framing.

2. Inspect roof deck to verify deck is clean and smooth, free of depressions, waves or projections, level to +/- 1/4" in 20', and properly sloped to [valleys] (or) [eaves].

3. Verify roof openings, curbs, pipes, sleeves, ducts or vents through roof are solidly set, cant strips and reglets in place, and nailing strips located.

4. Verify deck is dry and free of snow or ice. [Flutes in steel deck to be clean and dry] or [joints in wood deck to be solidly supported and nailed].

B. Underlayment:

1. Verify #30 unperforated asphalt saturated roofing felt underlayment has been installed over solid sheathing and fastened in place.

2. One (1) layer of #30 asphalt roofing felt paper for roof slopes of 3:12 and up, two (2) layers for roof slopes of 1:12 - 3:12 in moderate climates (check with Berridge).

3. Grace Ice & Water Shield underlayment to be used on all curved applications and on low (less than 1:12) slope or complex roofs per Berridge recommendation.

4. Ensure felt installed horizontally, starting at eave to ridge with a 6" minimum overlap and 18" endlaps.

5. Ensure that all nail heads are totally flush with the substrate. Nails shall be galvanized roofing nails with Berridge Coated Felt Caps.

3.02 INSTALLATION

A. Comply with manufacturers standard instructions and conform to standards set forth in the Architectural Sheet Metal Manual published by SMACNA, in order to achieve a watertight installation.

B. Install panels in such a manner that horizontal lines are true and level and vertical lines are plumb.

C. Install starter and edge trim before installing roof panels.

D. Remove protective strippable film prior to installation of roof panels.

E. Attach panels using manufacturer's standard clips and fasteners, spaced in accordance with approved shop drawings.

F. Install sealants for preformed roofing panels as approved on shop drawings.

G. Do not allow panels or trim to come into contact with dissimilar materials.

H. Do not allow traffic on completed roof. If required, provide cushioned walk boards.

I. Protect installed roof panels and trim from damage caused by adjacent construction until completion of installation.

J. Remove and replace any panels or components which are damaged beyond successful repair.

3.03 CLEANING

A. Clean any grease, finger marks or stains from the panels per manufacturer's recommendations.

B. Remove all scrap and construction debris from the site.

3.04 FINAL INSPECTION

A. Final inspection will be performed by a firm appointed and paid for by the owner in accordance with section 01410.

END OF SECTION

NOTE: Please reference Berridge Manufacturing Company's current Sweet's Catalog 07610/BER , Sweet's BuyLine 49510 and 07410/BER for standard product offering with regard to materials, gauges, finishes and colors available.


Return to Factory Products page

Back to Home Page


Berridge S-Tile

Berridge S-Tile panels are roll-formed then stamped with a clean, crisp s-tile configuration. While the exposed fasteners and large tile sheet modules make S-Tile a very economical roof system, it has an elegant appearance. S-Tile has a coverage width of 32 -11/16", with tile step lengths of 14".

DOWNLOAD CAD DETAILS

(78KB - 1 DWG PRODUCT OVERVIEW)

S-Tile Specifications

To use these specs in your project document, just use your mouse to drag and select all specification copy, then copy to the clipboard (CTRL - C), then paste into an open document.

MANUFACTURER

Berridge Manufacturing Company

1720 Maury Street

Houston, Texas 77026

Phone: (800) 231-8127 Outside TX

(713) 223-4971 In TX

Fax: (713) 236-9

PDF DATA SHEET  (3 MB FILE)
PDF File of Installation Details

S-TILE ROOF PANEL

The Berridge S-Tile System is composed of prefinished 24-ga. Roll-formed tile sheets. Provides a crisp, "s-tile" appearance .

- Simulated "S" Tile appearance

- Continuous length eave-to-ridge panels up to 40’ long

- Light weight: only 1.2 pounds per square foot

- May be installed over old shingles or other roofing

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Preformed, prefinished metal roofing and flashings.

B. Miscellaneous trim, flashing, closures, drip flashing,

and accessories.

C. Sealant

D. Fastening devices.

1.02 RELATED SECTIONS

A. Section 05120: Structural Steel Framing.

B. Section 05500: Miscellaneous metal fabrication.

C. Section 06100: Rough Carpentry.

D. Section 07631: Flashing and Sheet Metal Gutters.

E. Section 07900: Sealants.

1.03 REFERENCES

A. American Iron & Steel Institute (AISI) Specification for the Design of Coldformed Steel Structural Members.

B. ASTM A-653 & ASTM A924  Steel Sheet, Zinc-Coated (Galvanized)

C. Spec Data Sheet - Galvalume Sheet Metal by Bethlehem Corp.

D. SMACNA - Architectural Sheet Metal Manual.

1.04 ASSEMBLY DESCRIPTION

A. The roofing assembly includes preformed sheet metal panels, related accessories, valleys, hips, ridges, eaves, corners, rakes, miscellaneous flashing and attaching devices.

1.05 SUBMITTALS

A. Submit detailed drawings showing layout of panels, anchoring details, joint details, trim, flashing, and accessories. Show details of weatherproofing, terminations, and penetrations of metal work.

B. Submit a sample of each type of roof panel, complete with factory finish.

C. Submit calculations with registered engineer seal, verifying roof panel and attachment method resists wind pressures imposed on it pursuant to applicable building codes.

1.06 QUALITY ASSURANCE

A. Manufacturer: Company specializing in Architectural Sheet Metal Products with ten (10) years minimum experience.

B. No product substitutions shall be permitted without meeting specifications.

C. Substitutions shall be submitted 10 Days prior to Bid Date and acceptance put forth in an addendum.

D. No substitutions shall be made after the Bid Date.

1.07 DELIVERY, STORAGE AND HANDLING

A. Upon receipt of panels and other materials, installer shall examine the shipment for damage and completeness.

B. Panels should be stored in a clean, dry place. One end should be elevated to allow moisture to run off.

C. Panels with strippable film must not be stored in the open, exposed to the sun.

D. Stack all materials to prevent damage and to allow for adequate ventilation.

1.08 WARRANTY

A. Paint finish shall have a twenty year guarantee against cracking, peeling and fade (not to exceed 5 N.B.S. units).

B. Galvalume material shall have a twenty year guarantee against failure due to corrosion, rupture or perforation.

C. Applicator shall furnish guarantee covering watertightness of the roofing system for the period of two (2) years from the date of substantial completion.

PART 2 PRODUCT

2.01 ACCEPTABLE MANUFACTURERS

A. Berridge Manufacturing Company, Houston, Texas.

B. Substitutions shall fully comply with specified require-ments.

2.02 SHEET MATERIALS

A. Prefinished Metal shall be Hot-Dipped Galvanized - ASTM A446-85 Grade C G90 Coating A525-86 24 Gauge core steel or prefinished Galvalume - ASTM A792-86 AZ-55.

B. Unfinished Metal shall be Grade C Galvalume ASTM 792-86, AZ 55, "Satin Finish".

C. Finish shall be [full strength Kynar 500 Fluoropolymer coating] [Copper-Cote][Lead-Cote] [Champagne] coating, applied by the manufacturer on a continuous coil coating line, with a top side dry film thickness of 0.70 to 0.90 mil over 0.25 to 0.35 mil prime coat, to provide a total dry film thickness of 0.95 to 1.25 mil. Bottom side shall be coated with primer with a dry film thickness of 0.25 mil. Finish shall conform to all tests for adhesion, flexibility, and longevity as specified by the Kynar 500 finish supplier.

D. Strippable film shall be applied to the top side of the painted coil to protect the finish during fabrication, shipping and field handling. This strippable film must be removed before installation.

2.03 ACCESSORY MATERIALS

A. Fasteners: [Galvanized Steel] [Stainless Steel] [Cadmium Plated Steel] with washers where required.

B. Sealant: As specified in Section 07900 [ ] Type.

2.04 FABRICATION

A. All exposed adjacent flashing shall be of the same material and finish as the roof panels.

B. Hem all exposed edges of flashing on underside, 1/2 inch.

2.05 BERRIDGE S-TILE PANEL

1. Panels shall have a stamped S-Tile design of non-combustible 24-gauge steel with a Class A Fire Rating.

2. Panel profile thickness shall be 1-1/2" with  nominal coverage width of 32-11/16".

3. Panels shall be factory formed to 40' max.

4. Each panel shall have a purlin bearing leg and water drainage channel.

5. Panels shall be of an overlapping design with a line of tape sealant applied in the seam for watertightness on roof slopes of 3:12 or less.

6. Panels shall be fastened to substrate with exposed fasteners with metal backed neoprene washers with heads to match panel color.

7. Panel-to-panel and panel-to-purlin connections shall be with #12-14 fasteners, 1" minimum for panel-to-purlin connections and _" minimum for panel-to-panel stitch connections.

8. Continuous inside foam closures at ridge, hip, eave and valley shall be in matching contour to the S-Tile profile.

PART 3 EXECUTION

3.01 INSPECTION

A. Substrate:

1. Examine plywood or metal deck to ensure proper attachment to framing.

2. Inspect roof deck to verify deck is clean and smooth,free of depressions, waves or projections, level to +/- 1/4" in 20', and properly sloped to [valleys] (or) [eaves].

3. Verify roof openings, curbs, pipes, sleeves, ducts or vents through roof are solidly set, cant strips and reglets in place, and nailing strips located.

4. Verify deck is dry and free of snow or ice. [Flutes in steel deck to be clean and dry] or [joints in wood deck to be solidly supported and nailed].

B. Underlayment:

1. Verify #30 unperforated asphalt saturated roofing felt underlayment has been installed over solid sheathing and fastened in place.

2. One (1) layer of #30 asphalt roofing felt paper for roof slopes of 3:12 and up, two (2) layers for roof slopes of 1:12 - 3:12 in moderate climates (check with Berridge).

3. Grace Ice & Water Shield underlayment to be used on all curved applications and on low (less than 1:12) slope or complex roofs per Berridge recommendation.

4. Ensure felt installed horizontally, starting at eave to ridge with a 6" minimum overlap and 18" endlaps.

5. Ensure that all nail heads are totally flush with the substrate. Nails shall be galvanized roofing nails with Berridge Coated Felt Caps.

3.02 INSTALLATION

A. Comply with manufacturers standard instructions and conform to standards set forth in the Architectural Sheet Metal Manual published by SMACNA, in order to achieve a watertight installation.

B. Install panels in such a manner that horizontal lines are true and level and vertical lines are plumb.

C. Install starter and edge trim before installing roof panels.

D. Remove protective strippable film prior to installation of roof panels.

E. Attach panels using manufacturer's standard fasteners, spaced in accordance with approved shop drawings.

F. Install sealants for preformed roofing panels as approved on shop drawings.

G. Do not allow panels or trim to come into contact with dissimilar materials.

H. Do not allow traffic on completed roof. If required, provide cushioned walk boards.

I. Protect installed roof panels and trim from damage caused by adjacent construction until completion of installation.

J. Remove and replace any panels or components which are damaged beyond successful repair.

3.03 CLEANING

A. Clean any grease, finger marks or stains from the panels per manufacturer's recommendations.

B. Remove all scrap and construction debris from the site.

3.04 FINAL INSPECTION

A. Final inspection will be performed by a firm appointed and paid for by the owner in accordance with section 01410.

END OF SECTION

NOTE: Please reference Berridge Manufacturing Company's current Sweet's Catalog 07610/BER , Sweet's BuyLine 49510 and 07410/BER for standard product offering with regard to materials, gauges, finishes and colors available.


Back to Top of Page

Return to Factory Products page

Back to Home Page