- T-3 Overview
- T-4 Panel Spice Detail
- T-5 Seam Splice Detail
- T-6 Alternate Seam Splice Detail
- T-7 Insulated Deck Detail
- T-10 Eave Detail
- T-11 Eave Detail
- T-12 Eave Detail
- T-20 Ridge & Hip Detail
- T-21 Shed Rood Ridge Cap Detail
- T-22 Ridge Termination At Dormer Valley
- T-30 Gable Detail
- T-31 Gable Detail
- T-32 Gable Detail
- T-33 Gable Detail
- T-40 Parapet Detail
- T-50 Head Wall Detail
- T-51 Rake Wall Detail
- T-52 Head Wall Detail
- T-53 Rake Wall Detail
- T-54 Rake At Eave
- T-60 Slope Transition Detail
- T-61 Slope Transition Detail Roof To Fascia – A
- T-62 Slope Transition Detail Roof To Fascia – B
- T-63 Folding Tee-Clip Installation
- T-70 Valley Details
- T-71 Valley Detail Isometric
- T-80 4″ Dia Pipe Penetration In Pan
- T-81 Pipe Penetration Of Panel Seam: Iso & Plan View
- T-82 Pipe Penetration Of Panel Seam – Sections
- T-83 Roof Penetration — Rectangular/Square
- T-84 Roof Penetration — Section A
- T-85 Roof Penetration — Section B